QII Field Checklist

Quality Insulation Installation · RA3.5 · CF3R-ENV-21/22 via CHEERS · HERS/ECC Rater
⚠ AUTOMATIC FAIL: Covering insulation with drywall or any other material before the HERS/ECC Rater completes their verification is an automatic FAIL. The only remedies are (1) expose the insulation by removing drywall, or (2) perform a whole-building blower door test demonstrating ≤0.40 cfm/ft² building envelope leakage at 0.3 in. w.g.
⚠ Verify header insulation: single-member window/door headers need R-3 (2×4 framing) or R-5 (other assemblies), orR-2 continuous exterior insulation. Adjust framing/plans to accommodate.
Project Info
Code cycle:
Overall Progress
0 / 0 resolved (0%)
✓ 0 compliant ✗ 0 non-compliant N/A 0
📷 Field Reference Photos (from CHEERS QII Handbook)
Per RA3.5 · Forms registered through CHEERS · HERS/ECC Rater field verification